Safety points for attention while assembling pipeline
DN(mm) | Permissible angular deflection while laying |
80-150 | 5°00‘ |
200-300 | 400 |
350-600 | 300 |
700-800 | 200 |
900-2600 | 130 |
1.It is necessary to wear safety helmet while entering the pipeline ditch
2.It is necessary to inspect the pipeline ditch whether existing dangerous landslide, if exist, absolutely prohibited to enter the ditch
3 while assembling large-diameter pipes with correction jack, the jack must be grasped up and down by two presons
4 While installing joint, cotton padded gloves must be used as far as possible
5 It is prohibited to enter the deeply alone after finishing assembling pipeline or for inspecting hydraulic pressure
In particular, if entering the pipeline which have been assembled and burried for a while or broken off for accident, in which would be often filled with CO (carbon monoxide) detector
Anyang General International Co., Ltd
E-mail: info@ductile-iron-pipes.com
Tel: (86) 372 5368538
Fax: (86) 372 5951936 Zip Code:455000
Add: No.2 Building, Huaqiang New Times, Xiange Road, Anyang, Henan, P.R.C.
Anyang General International Co., Ltd E-mail: info@ductile-iron-pipes.com
Tel: (86) 372 5368538 Fax: (86) 372 5951936 Zip Code:455000
Add: No.2 Building, Huaqiang New Times, Xiange Road, Anyang, Henan, P.R.C.
Copy right Sally ©2008 ANYANG GEMCO ENERGY MACHINERY CO.,LTD, Privacy Policy, Culture, quality certification,Scale, LINKS
Sales Network, organization,Technology,Manager`s oration, Development history, Business Scope, Operation Principles