Transportation Put two pieses or more woods on the platform of the vehicle while transportinmg, pipes are laid on the wood and fixed by wedge. The part over the vehicle body should not be more than 1/4 of overrall length of pipe. If pipes are piled up more than one layer, each layer of pipes should reverse, and buffering rubber or gasket should be put on the space between two layers of pipes, at last pipes are fixed up with steel cable and buffering gasket. Check often if pipes can fall out during conveying, and check if stop wedge is not hard up. The vehicle should slow down on the uneven road or while swerving. |
|
Anyang General International Co., Ltd
E-mail: info@ductile-iron-pipes.com
Tel: (86) 372 5368538
Fax: (86) 372 5951936 Zip Code:455000
Add: No.2 Building, Huaqiang New Times, Xiange Road, Anyang, Henan, P.R.C.
Anyang General International Co., Ltd E-mail: info@ductile-iron-pipes.com
Tel: (86) 372 5368538 Fax: (86) 372 5951936 Zip Code:455000
Add: No.2 Building, Huaqiang New Times, Xiange Road, Anyang, Henan, P.R.C.
Copy right Sally ©2008 ANYANG GEMCO ENERGY MACHINERY CO.,LTD, Privacy Policy, Culture, quality certification,Scale, LINKS
Sales Network, organization,Technology,Manager`s oration, Development history, Business Scope, Operation Principles